Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan

In 2006, Stora Enso Skog implemented an education program in water management for harvester operators, timber purchasers, cut block planners and supervisors. The focus of the program was creating stream crossings with minimal harm to the stream and the surrounding riparian area. This main purpose...

Descripción completa

Detalles Bibliográficos
Autor principal: Sundin, Sara
Formato: L3
Lenguaje:sueco
Inglés
Publicado: SLU/School for Forest Management 2008
Materias:
_version_ 1855572034119008256
author Sundin, Sara
author_browse Sundin, Sara
author_facet Sundin, Sara
author_sort Sundin, Sara
collection Epsilon Archive for Student Projects
description In 2006, Stora Enso Skog implemented an education program in water management for harvester operators, timber purchasers, cut block planners and supervisors. The focus of the program was creating stream crossings with minimal harm to the stream and the surrounding riparian area. This main purpose of this study was to determine the difference in work procedures before and after participating in the program. The methodology consisted of field studies and interviews with harvester operators and their supervisors. The field study looked at how the streams had been crossed concerning the number of crossings, visible damage to the stream and/or the riparian area made by the machines. Biological parameters such as the width and dept of the stream and amount of large woody debris in the stream were also measured. The field result from 30 harvesting sites showed no significant difference between sites that had been harvested before or after the education program. But the harvester operators and their supervisors experienced an increased concern for watersheds after the educational program. The harvester operators liked the fact that the program both had practical and theoretical parts and that there was plenty of time for discussions. Before participating in the program they were less concerned with small streams, now they felt that all streams were important. The harvester operators felt that planning was important in order for them to do a good job, both concerning site planning and at harvesting time. Many of the teams and the supervisors would like to have portable bridges to carry with them to each site. Feedback between harvester teams, site planners and supervisors were also mentioned as a factor of success. Economical compensation is a prerequisite in order to make the harvester teams willing to put in the extra time needed for building bridges and for creating good stream crossings.
format L3
id RepoSLU12279
institution Swedish University of Agricultural Sciences
language swe
Inglés
publishDate 2008
publishDateSort 2008
publisher SLU/School for Forest Management
publisherStr SLU/School for Forest Management
record_format eprints
spelling RepoSLU122792017-11-01T08:47:10Z Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan Effects of forest harvesting on streams : before and after a water management program at Stora Enso Skog, district Siljan Sundin, Sara vattenvård bäcköverfart slutavverkning In 2006, Stora Enso Skog implemented an education program in water management for harvester operators, timber purchasers, cut block planners and supervisors. The focus of the program was creating stream crossings with minimal harm to the stream and the surrounding riparian area. This main purpose of this study was to determine the difference in work procedures before and after participating in the program. The methodology consisted of field studies and interviews with harvester operators and their supervisors. The field study looked at how the streams had been crossed concerning the number of crossings, visible damage to the stream and/or the riparian area made by the machines. Biological parameters such as the width and dept of the stream and amount of large woody debris in the stream were also measured. The field result from 30 harvesting sites showed no significant difference between sites that had been harvested before or after the education program. But the harvester operators and their supervisors experienced an increased concern for watersheds after the educational program. The harvester operators liked the fact that the program both had practical and theoretical parts and that there was plenty of time for discussions. Before participating in the program they were less concerned with small streams, now they felt that all streams were important. The harvester operators felt that planning was important in order for them to do a good job, both concerning site planning and at harvesting time. Many of the teams and the supervisors would like to have portable bridges to carry with them to each site. Feedback between harvester teams, site planners and supervisors were also mentioned as a factor of success. Economical compensation is a prerequisite in order to make the harvester teams willing to put in the extra time needed for building bridges and for creating good stream crossings. Som ett led i att tillgodose nya riktlinjer gällande vattenvård genomförde Stora Enso Skog under hösten 2006 en utbildning för virkesinköpare, planerare, drivningsledare samt maskinförare. Utbildningen syftade till att minimera ingreppet på vatten vid enskilda avverkningsobjekt. Detta examensarbete har genom fältstudier samt intervjuer med berörda parter undersökt skillnaden kring arbetssättet före och efter utbildningen. I fältstudien kvantifierades död ved i vatten, avverkningsrester, antal överfarter, körspår och skadefrekvens i kantzon. Resultaten från 30 olika trakter uppvisade inga signifikanta skillnader mellan trakter som avverkats före respektive trakter som avverkats efter utbildningsinsatsen. Men både lagen och arbetsledningen upplevde en förbättring av hänsynen till vattendrag efter utbildningen, och att ett intresse för vatten hade väckts. Lagen tyckte att sättet utbildningen gjorts på var bra med praktiska exempel och diskussionspunkter. Innan utbildningen tog de inte lika stor hänsyn till mindre bäckar och diken som de upplevde att de gör nu. Avverkningslagen upplevde att planering var en viktig faktor i att få ett bra resultat på arbetet, både gällande fältplanering och avverkningstidpunkt. Flera lag samt arbetsledningen efterlyste markskonare för att kunna göra ett bättre jobb samt återkoppling mellan lag och arbetsledning. En förutsättning för att maskinlagen ska lägga arbete på bra bäcköverfarter är att de får ekonomisk ersättning för detta. SLU/School for Forest Management 2008 L3 swe eng https://stud.epsilon.slu.se/12279/
spellingShingle vattenvård
bäcköverfart
slutavverkning
Sundin, Sara
Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan
title Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan
title_full Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan
title_fullStr Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan
title_full_unstemmed Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan
title_short Vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på Stora Enso Skog, distrikt Siljan
title_sort vattenvård vid slutavverkning : före och efter vattenvårdsutbildning på stora enso skog, distrikt siljan
topic vattenvård
bäcköverfart
slutavverkning