Skip to content
VuFind
    • English
    • Español
Advanced
  • The economics of re-operating...
  • Cite this
  • Text this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Cover Image
QR Code

The economics of re-operating the Akosombo and Kpong hydropower dams

Bibliographic Details
Main Authors: Balana, Bedru, Mul, Marloes L., Mante, Yaw
Format: Book Chapter
Language:Inglés
Published: 2017
Subjects:
economic development
dam construction
water power
ecosystem services
cost benefit analysis
irrigated farming
health hazards
fisheries
aquatic weeds
sediment
infrastructure
domestic water
Online Access:https://hdl.handle.net/10568/92799
  • Description
  • Similar Items
  • Staff View
Description
Description not available.

Similar Items

  • Overview of the re-operation and re-optimisation of the Akosombo and Kpong Dams Project
    by: Ofosu, Eric Antwi, et al.
    Published: (2017)
  • Framework for re-operating the large hydropower dams to improve local livelihoods and poverty reduction
    by: Mul, Marloes L., et al.
    Published: (2017)
  • Re-operating large dams to benefit all -- experiences from Akosombo and Kpong dams in Ghana
    by: Mul, Marloes L.
    Published: (2017)
  • The resettlement experience of Ghana analyzed via case studies of the Akosombo and Kpong dams
    by: Raschid-Sally, Liqa, et al.
    Published: (2008)
  • The effects of hydropower dams on the hydrology of the Mekong Basin
    by: Hecht, J., et al.
    Published: (2014)

© Copyright 2026, Todos los Derechos Reservados UNA