The economics of re-operating the Akosombo and Kpong hydropower dams
| Autores principales: | , , |
|---|---|
| Formato: | Capítulo de libro |
| Lenguaje: | Inglés |
| Publicado: |
2017
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/92799 |
Ejemplares similares: The economics of re-operating the Akosombo and Kpong hydropower dams
- Overview of the re-operation and re-optimisation of the Akosombo and Kpong Dams Project
- Framework for re-operating the large hydropower dams to improve local livelihoods and poverty reduction
- Re-operating large dams to benefit all -- experiences from Akosombo and Kpong dams in Ghana
- The effects of hydropower dams on the hydrology of the Mekong Basin
- Trade-offs between hydropower production and downstream flow requirements
- The resettlement experience of Ghana analyzed via case studies of the Akosombo and Kpong dams