Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals

At Marala barrage, two canals, i.e. Marala Ravi Link Canal (MRLC) and Upper Chenab Canal (UCC) off-take from left side of the River Chenab. MRLC has a very old history of experiencing sedimentation issues. Several attempts have been made to counterfoil or minimize this problem in the recent past. Tw...

Full description

Bibliographic Details
Main Authors: Ashraf, M., Bhatti, Muhammad Tousif, Shakir, A.S., Tahir, A.A., Ahmad.A.
Format: Journal Article
Language:Inglés
Published: Springer 2015
Subjects:
Online Access:https://hdl.handle.net/10568/77546

Similar Items: Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals