Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals
At Marala barrage, two canals, i.e. Marala Ravi Link Canal (MRLC) and Upper Chenab Canal (UCC) off-take from left side of the River Chenab. MRLC has a very old history of experiencing sedimentation issues. Several attempts have been made to counterfoil or minimize this problem in the recent past. Tw...
| Autores principales: | , , , , |
|---|---|
| Formato: | Journal Article |
| Lenguaje: | Inglés |
| Publicado: |
Springer
2015
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/77546 |
Ejemplares similares: Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals
- River bank erosion and channel evolution in sand-bed braided reach of River Chenab: role of floods during different flow regimes
- Modelling erosion and sedimentation in the Upper Blue Nile
- Economic impacts of large dams on downstream brickmaking in developing countries
- Blue Nile flow, sediment and impact of watershed interventions: case of Gumera Watershed
- Analysis of flow and baseflow trends in the Usangu Catchment, Tanzania
- Riverbed clogging experiments at potential river bank filtration sites along the Ping River, Chiang Mai, Thailand