Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals

At Marala barrage, two canals, i.e. Marala Ravi Link Canal (MRLC) and Upper Chenab Canal (UCC) off-take from left side of the River Chenab. MRLC has a very old history of experiencing sedimentation issues. Several attempts have been made to counterfoil or minimize this problem in the recent past. Tw...

Descripción completa

Detalles Bibliográficos
Autores principales: Ashraf, M., Bhatti, Muhammad Tousif, Shakir, A.S., Tahir, A.A., Ahmad.A.
Formato: Journal Article
Lenguaje:Inglés
Publicado: Springer 2015
Materias:
Acceso en línea:https://hdl.handle.net/10568/77546

Ejemplares similares: Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals