Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration
| Autores principales: | , , , |
|---|---|
| Formato: | Journal Article |
| Lenguaje: | Inglés |
| Publicado: |
2000
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/41331 |
| _version_ | 1855527030170320896 |
|---|---|
| author | Sarwar, A. Bastiaanssen, Wim G.M. Boers, T.M. Dam, Jos C. van |
| author_browse | Bastiaanssen, Wim G.M. Boers, T.M. Dam, Jos C. van Sarwar, A. |
| author_facet | Sarwar, A. Bastiaanssen, Wim G.M. Boers, T.M. Dam, Jos C. van |
| author_sort | Sarwar, A. |
| collection | Repository of Agricultural Research Outputs (CGSpace) |
| format | Journal Article |
| id | CGSpace41331 |
| institution | CGIAR Consortium |
| language | Inglés |
| publishDate | 2000 |
| publishDateRange | 2000 |
| publishDateSort | 2000 |
| record_format | dspace |
| spelling | CGSpace413312023-06-12T14:28:32Z Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration Sarwar, A. Bastiaanssen, Wim G.M. Boers, T.M. Dam, Jos C. van drainage design evaluation simulation models calibrations evapotranspiration soil water waterlogging soil salinity water table discharges 2000 2014-06-13T14:57:54Z 2014-06-13T14:57:54Z Journal Article https://hdl.handle.net/10568/41331 en Limited Access Sarwar, A.; Bastiaanssen, W. G. M.; Boers, T. M.; van Dam, J. C. 2000. Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration. Irrigation and Drainage Systems, 14(4):257-280. |
| spellingShingle | drainage design evaluation simulation models calibrations evapotranspiration soil water waterlogging soil salinity water table discharges Sarwar, A. Bastiaanssen, Wim G.M. Boers, T.M. Dam, Jos C. van Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration |
| title | Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration |
| title_full | Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration |
| title_fullStr | Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration |
| title_full_unstemmed | Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration |
| title_short | Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration |
| title_sort | evaluating drainage design parameters for the fourth drainage project pakistan by using swap model part i calibration |
| topic | drainage design evaluation simulation models calibrations evapotranspiration soil water waterlogging soil salinity water table discharges |
| url | https://hdl.handle.net/10568/41331 |
| work_keys_str_mv | AT sarwara evaluatingdrainagedesignparametersforthefourthdrainageprojectpakistanbyusingswapmodelparticalibration AT bastiaanssenwimgm evaluatingdrainagedesignparametersforthefourthdrainageprojectpakistanbyusingswapmodelparticalibration AT boerstm evaluatingdrainagedesignparametersforthefourthdrainageprojectpakistanbyusingswapmodelparticalibration AT damjoscvan evaluatingdrainagedesignparametersforthefourthdrainageprojectpakistanbyusingswapmodelparticalibration |