Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration
| Autores principales: | , , , |
|---|---|
| Formato: | Journal Article |
| Lenguaje: | Inglés |
| Publicado: |
2000
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/41331 |
Ejemplares similares: Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part I - calibration
- Evaluating drainage design parameters for the Fourth Drainage Project, Pakistan by using SWAP model: Part II - modeling results
- Impact of drainage on waterlogging situation in the Bareji Distributary Command
- Waterlogging and salinity management in the Sindh Province, Pakistan. Volume 1, supplement I-D. Drainage in the LBOD Project: impact assessment
- Assessing the performance of WaSim and DRAINMOD models for subsurface drainage design and analysis in a data-scarce environment
- Water management strategies for areas with poor drainage or shallow watertable conditions (second phase)
- Operation and maintenance cost of drainage system: The case study of Bareji Distributary, Mirpurkhas, Sindh, Pakistan