Vattenlogistik vid stubbehandling i slutavverkning

Water logistics has long been a problem in order to effectively carry out stump treatment in both thinning and final felling. It is important that the stump treatment‐ equipment is configured as well as a sufficient amount of water is carried out on the harvester to get a cost‐ effective treatment....

Descripción completa

Detalles Bibliográficos
Autor principal: Ekström, Henrik
Formato: First cycle, G2E
Lenguaje:sueco
sueco
Publicado: 2014
Materias:
Acceso en línea:https://stud.epsilon.slu.se/6880/
_version_ 1855571085827768320
author Ekström, Henrik
author_browse Ekström, Henrik
author_facet Ekström, Henrik
author_sort Ekström, Henrik
collection Epsilon Archive for Student Projects
description Water logistics has long been a problem in order to effectively carry out stump treatment in both thinning and final felling. It is important that the stump treatment‐ equipment is configured as well as a sufficient amount of water is carried out on the harvester to get a cost‐ effective treatment. The flow control of the equipment has improved and water can be dispensed more efficient, but still the amount of water on the machine is a crucial factor in the total cost estimate. The knowledge of the tools available to bring water as well as the internal logistics of loading and transport to the felling site is deficient. Increased focus on "smart" solutions to manage water cost is of great importance in order to combat Hetrobasidion spp in both thinning and final felling. The purpose of the study is to describe and summarize different solutions of water logistics at stump treatment in final felling. Holmen Skog's goal is to find good ways and a possible equipment to get a cost‐ effective solution of water logistics. The two contractors Thörnwalls and MJN have developed their own ways to get an effective water logistics and their solutions will be studied in more detail. The results of the study show that the duration of Thörnwalls water logistics requires about 50 minutes per working day. The water Logistics of MJN requires about 20 minutes per working day. Both contractors have developed a water logistics with a few and effective moments. Thörnwalls has managed to develop a way to work that is free from physical handling of water, MJN have the same goal. To get an efficient water logistics requires primarily an approach based on procedures and division of responsibility. The equipment must be properly adjusted and all the physical lifting moments with water should be avoided to make logistics easy and efficient.
format First cycle, G2E
id RepoSLU6880
institution Swedish University of Agricultural Sciences
language Swedish
swe
publishDate 2014
publishDateSort 2014
record_format eprints
spelling RepoSLU68802014-07-14T10:20:26Z https://stud.epsilon.slu.se/6880/ Vattenlogistik vid stubbehandling i slutavverkning Ekström, Henrik Forest engineering Water logistics has long been a problem in order to effectively carry out stump treatment in both thinning and final felling. It is important that the stump treatment‐ equipment is configured as well as a sufficient amount of water is carried out on the harvester to get a cost‐ effective treatment. The flow control of the equipment has improved and water can be dispensed more efficient, but still the amount of water on the machine is a crucial factor in the total cost estimate. The knowledge of the tools available to bring water as well as the internal logistics of loading and transport to the felling site is deficient. Increased focus on "smart" solutions to manage water cost is of great importance in order to combat Hetrobasidion spp in both thinning and final felling. The purpose of the study is to describe and summarize different solutions of water logistics at stump treatment in final felling. Holmen Skog's goal is to find good ways and a possible equipment to get a cost‐ effective solution of water logistics. The two contractors Thörnwalls and MJN have developed their own ways to get an effective water logistics and their solutions will be studied in more detail. The results of the study show that the duration of Thörnwalls water logistics requires about 50 minutes per working day. The water Logistics of MJN requires about 20 minutes per working day. Both contractors have developed a water logistics with a few and effective moments. Thörnwalls has managed to develop a way to work that is free from physical handling of water, MJN have the same goal. To get an efficient water logistics requires primarily an approach based on procedures and division of responsibility. The equipment must be properly adjusted and all the physical lifting moments with water should be avoided to make logistics easy and efficient. 2014-06-17 First cycle, G2E NonPeerReviewed application/pdf sv https://stud.epsilon.slu.se/6880/7/ekstrom_h_140617.pdf Ekström, Henrik, 2014. Vattenlogistik vid stubbehandling i slutavverkning. First cycle, G2E. Skinnskatteberg: (S) > School for Forest Management <https://stud.epsilon.slu.se/view/divisions/OID-210.html> urn:nbn:se:slu:epsilon-s-3378 swe
spellingShingle Forest engineering
Ekström, Henrik
Vattenlogistik vid stubbehandling i slutavverkning
title Vattenlogistik vid stubbehandling i slutavverkning
title_full Vattenlogistik vid stubbehandling i slutavverkning
title_fullStr Vattenlogistik vid stubbehandling i slutavverkning
title_full_unstemmed Vattenlogistik vid stubbehandling i slutavverkning
title_short Vattenlogistik vid stubbehandling i slutavverkning
title_sort vattenlogistik vid stubbehandling i slutavverkning
topic Forest engineering
url https://stud.epsilon.slu.se/6880/
https://stud.epsilon.slu.se/6880/