Overview of the re-operation and re-optimisation of the Akosombo and Kpong Dams Project
| Autores principales: | , , , , |
|---|---|
| Formato: | Capítulo de libro |
| Lenguaje: | Inglés |
| Publicado: |
2017
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/92802 |
Ejemplares similares: Overview of the re-operation and re-optimisation of the Akosombo and Kpong Dams Project
- The economics of re-operating the Akosombo and Kpong hydropower dams
- Framework for re-operating the large hydropower dams to improve local livelihoods and poverty reduction
- Re-operating large dams to benefit all -- experiences from Akosombo and Kpong dams in Ghana
- Trade-offs between hydropower production and downstream flow requirements
- The resettlement experience of Ghana analyzed via case studies of the Akosombo and Kpong dams
- Water resources implications of integrating malaria control into the operation of an Ethiopian dam