Sequential irrigation scheduling avoiding night irrigation
The sequential irrigation scheduling problem is one where a set of irrigation jobs have to be scheduled sequentially. In this paper, an integer program is presented to solve this problem. The objective function is a dual-goal function that avoids night irrigation and minimizes earliness or tardiness...
| Autores principales: | , |
|---|---|
| Formato: | Journal Article |
| Lenguaje: | Inglés |
| Publicado: |
American Society of Civil Engineers
2017
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/89281 |
Ejemplares similares: Sequential irrigation scheduling avoiding night irrigation
- Genetic algorithms for the sequential irrigation scheduling problem
- Irrigation scheduling using complex machine scheduling
- Simultaneous-irrigation scheduling GA [genetic algorithm] model with identical discharges and travel time
- Irrigation scheduling advice: Egypt
- Routing field channels through a tertiary unit with heterogeneous fields
- Irrigation scheduling advice: Tunisia