Canal operations planner. I: maximizing delivery performance ratio
A key operational objective for the management of the Indus Basin Irrigation System of Pakistan is the distribution of water among tertiary canals in a transparent and equitable manner. Decisions on canal operations are disseminated as a Canal Operation Plan, or a Rotational Program, for each crop s...
| Main Authors: | , , |
|---|---|
| Format: | Journal Article |
| Language: | Inglés |
| Published: |
American Society of Civil Engineers
2016
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/10568/77804 |
Similar Items: Canal operations planner. I: maximizing delivery performance ratio
- Canal operations planner. II: minimizing inequity
- Canal operations planner. III: minimizing inequity with delivery performance ratio relaxation
- Routing field channels through a tertiary unit with heterogeneous fields
- Algorithmic differentiation of linear mixed models with variance-covariance structures
- Calibration and application of a hydraulic model for the operation of an irrigation canal: a study in the Chistian Subdivision, Fordwah/Eastern Sadiqia Area, Punjab, Pakistan
- Simultaneous-irrigation scheduling GA [genetic algorithm] model with identical discharges and travel time