Skip to content
VuFind
    • English
    • Español
Advanced
  • Using a hydro-dynamic flow mod...
  • Cite this
  • Text this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Cover Image
QR Code

Using a hydro-dynamic flow model to plan maintenance activities and improve irrigation water distribution: Application to the Fordwah Distributary in Punjab, Pakistan

Bibliographic Details
Main Authors: Waijjen, E.G. van, Hart, W.W.H., Kuper, M., Brouwer, R.
Format: Journal Article
Language:Inglés
Published: 1997
Subjects:
irrigation management
irrigation canals
distributary canals
water distribution
irrigation water
maintenance
flow control
simulation models
performance evaluation
performance indexes
Online Access:https://hdl.handle.net/10568/41423
  • Description
  • Similar Items
  • Staff View
Description
Description not available.

Similar Items

  • Maintenance plans for irrigation facilities of pilot distributaries in Sindh Province, Pakistan. Volume 3 - Bareji Distributary, Mirpurkhas District
    by: Memon, A.A., et al.
    Published: (1997)
  • Returns to facilitating farmers' organisations for distributary maintenance: Empirical results from a pilot project in Southern Punjab
    by: Mehmood Ul Hassan, et al.
    Published: (1999)
  • Pre-takeover comparative performance of water users organizations of Hakra 4-R Distributary, Punjab, Pakistan
    by: Waheed-uz-Zaman, et al.
    Published: (1998)
  • Performance assessment of an irrigation system: application to the Fordwah Branch Canal System
    by: Habib, Z., et al.
    Published: (1996)
  • Improving canal system management: An intervention to calibrate control structures in Punjab, Pakistan
    by: Shahid, B. A., et al.
    Published: (1994)

© Copyright 2026, Todos los Derechos Reservados UNA