Local challenges for IWRM in Afghanistan

Over the past 25 years, there has been a sharp increase in the number and the intensity of use of mills and micro-hydropower units within canal systems in Afghanistan. Before the Soviet occupation, the construction of non-consumptive structures was regulated. Through a case study in one canal along...

Descripción completa

Detalles Bibliográficos
Autores principales: Thomas, V., Osmani, A., Wegerich, Kai
Formato: Journal Article
Lenguaje:Inglés
Publicado: Informa UK Limited 2011
Materias:
Acceso en línea:https://hdl.handle.net/10568/40466

Ejemplares similares: Local challenges for IWRM in Afghanistan