Skip to content
VuFind
    • English
    • Español
Advanced
  • Converting a fabricated cutthr...
  • Cite this
  • Text this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Cover Image
QR Code

Converting a fabricated cutthroat flume into a discharge measuring instrument

Bibliographic Details
Main Authors: Siddiqui, R., Lashari, Bakhshal K., Skogerboe, G.V.
Format: Informe técnico
Language:Inglés
Published: International Irrigation Management Institute 1996
Subjects:
flumes
measuring instruments
flow measurement
discharges
open channels
Online Access:https://hdl.handle.net/10568/39583
  • Description
  • Similar Items
  • Staff View
Description
Description not available.

Similar Items

  • Field calibration of irrigation flow control structures
    by: Skogerboe, G.V., et al.
    Published: (1992)
  • Development and use of rectangular channels with a single current meter measurement for recording farm water deliveries (annexes)
    by: Bukhari, N.H., et al.
    Published: (1998)
  • Training course: Field Calibration of Irrigation Structures, Fordwah Canal, Fordwah Eastern Sadiqia Irrigation and Drainage Project, Bahawalnagar, 28 May to 6 June, 1995 - Technical report
    by: Ahmad, M., et al.
    Published: (1995)
  • Field discharge calibration of head regulators, Mirpurkhas Sub-division, Jamrao Canal, Nara Circle, Sindh Province, Pakistan
    by: Khan, A.H., et al.
    Published: (1998)
  • Development and use of rectangular channels with a single current meter measurement for recording farm water deliveries
    by: Bukhari, N.H., et al.
    Published: (1998)

© Copyright 2026, Todos los Derechos Reservados UNA