Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results

The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described.

Bibliographic Details
Main Authors: Sally, Hilmy, Berthery, D., Certain, F., Durbec, A.
Format: Artículo preliminar
Language:Inglés
Published: International Irrigation Management Institute 1989
Subjects:
Online Access:https://hdl.handle.net/10568/39166
Description
Summary:The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described.