Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results
The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described.
| Main Authors: | , , , |
|---|---|
| Format: | Artículo preliminar |
| Language: | Inglés |
| Published: |
International Irrigation Management Institute
1989
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/10568/39166 |
| Summary: | The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described. |
|---|