Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments

Ethiopia is among countries which has very low modern energy sources. The topographic feature and the available water of Ethiopia permit to have a large hydropower potential. However, as the available runoff in rivers has very high hydrological variability, tapping in to this potential require inves...

Full description

Bibliographic Details
Main Authors: Desalegn, D.T., Awulachew, Seleshi Bekele, Moges, S. A.
Format: Conference Paper
Language:Inglés
Published: 2008
Subjects:
Online Access:https://hdl.handle.net/10568/38444
_version_ 1855525231776497664
author Desalegn, D.T.
Awulachew, Seleshi Bekele
Moges, S. A.
author_browse Awulachew, Seleshi Bekele
Desalegn, D.T.
Moges, S. A.
author_facet Desalegn, D.T.
Awulachew, Seleshi Bekele
Moges, S. A.
author_sort Desalegn, D.T.
collection Repository of Agricultural Research Outputs (CGSpace)
description Ethiopia is among countries which has very low modern energy sources. The topographic feature and the available water of Ethiopia permit to have a large hydropower potential. However, as the available runoff in rivers has very high hydrological variability, tapping in to this potential require investment on storage to smooth the temporal hydrological variability. In this paper, first the behaviour of this hydrological variability and implication of water resources development is discussed. Secondly, various documents and reports provide varying values of hydropower potential of Ethiopia and Abbay. To close the information gap, topographical and hydrological site evaluation for the selected hydropower potential sites have been carried out, for 129 possible potentials sites which are identified by WAPCOS in 1990 and having total capacity of 13,845 MW. After evaluations these sites 91 possible sites with potential of 12,148 MW are identified and mapped under various sub-basins. Dabus sub-basin stands first among the 16 sub-basins by 13 hydropower potential sites and these sites give 3524MW. In order to exploit the available hydropower potential in the country, it is crucial to rank these sites. The ranking of these sites have been carried out based on cost per kilowatt hour of the hydropower potential (HP) sites. Furthermore, the paper discusses the benefits and tradeoffs for four priority development identified by ENTRO as Eastern Nile fast track projects.
format Conference Paper
id CGSpace38444
institution CGIAR Consortium
language Inglés
publishDate 2008
publishDateRange 2008
publishDateSort 2008
record_format dspace
spelling CGSpace384442023-02-15T12:05:47Z Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments Desalegn, D.T. Awulachew, Seleshi Bekele Moges, S. A. river basins water power energy resources Ethiopia is among countries which has very low modern energy sources. The topographic feature and the available water of Ethiopia permit to have a large hydropower potential. However, as the available runoff in rivers has very high hydrological variability, tapping in to this potential require investment on storage to smooth the temporal hydrological variability. In this paper, first the behaviour of this hydrological variability and implication of water resources development is discussed. Secondly, various documents and reports provide varying values of hydropower potential of Ethiopia and Abbay. To close the information gap, topographical and hydrological site evaluation for the selected hydropower potential sites have been carried out, for 129 possible potentials sites which are identified by WAPCOS in 1990 and having total capacity of 13,845 MW. After evaluations these sites 91 possible sites with potential of 12,148 MW are identified and mapped under various sub-basins. Dabus sub-basin stands first among the 16 sub-basins by 13 hydropower potential sites and these sites give 3524MW. In order to exploit the available hydropower potential in the country, it is crucial to rank these sites. The ranking of these sites have been carried out based on cost per kilowatt hour of the hydropower potential (HP) sites. Furthermore, the paper discusses the benefits and tradeoffs for four priority development identified by ENTRO as Eastern Nile fast track projects. 2008 2014-06-13T11:41:56Z 2014-06-13T11:41:56Z Conference Paper https://hdl.handle.net/10568/38444 en Limited Access Desalegn, D. T.; Awulachew, Seleshi Bekele; Moges, S. A. 2008. Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments. In Abtew, W.; Melesse, A. M. (Eds.). Proceedings of the Workshop on Hydrology and Ecology of the Nile River Basin under Extreme Conditions, Addis Ababa, Ethiopia, 16-19 June 2008. Sandy, UT, USA: Aardvark Global Publishing. pp.294.
spellingShingle river basins
water power
energy resources
Desalegn, D.T.
Awulachew, Seleshi Bekele
Moges, S. A.
Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
title Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
title_full Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
title_fullStr Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
title_full_unstemmed Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
title_short Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
title_sort blue nile abay hydropower potential prioritization and tradeoffs on priority investments
topic river basins
water power
energy resources
url https://hdl.handle.net/10568/38444
work_keys_str_mv AT desalegndt bluenileabayhydropowerpotentialprioritizationandtradeoffsonpriorityinvestments
AT awulachewseleshibekele bluenileabayhydropowerpotentialprioritizationandtradeoffsonpriorityinvestments
AT mogessa bluenileabayhydropowerpotentialprioritizationandtradeoffsonpriorityinvestments