Improving canal system management: An intervention to calibrate control structures in Punjab, Pakistan
| Main Authors: | , , |
|---|---|
| Format: | Book Chapter |
| Language: | Inglés |
| Published: |
1994
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/10568/37722 |
Similar Items: Improving canal system management: An intervention to calibrate control structures in Punjab, Pakistan
- Impacts of physical and managerial interventions on canal performance in Pakistan: a review of five years of field research studies
- Field discharge calibration of head regulators, Mirpurkhas Sub-division, Jamrao Canal, Nara Circle, Sindh Province, Pakistan
- Performance assessment of an irrigation system: application to the Fordwah Branch Canal System
- An evaluation of outlet calibration methods: a contribution to the study on collective action for water management below the outlet, Hakra 6-R Distributary
- Performance of secondary canals in Pakistan Punjab: research on equity and variability at the distributary level
- Physical characteristics and operational performance of Mirpurkhas Sub-Division, Jamrao Canal Division, Nara Circle, Sindh Province, Pakistan