Skip to content
VuFind
    • English
    • Español
Advanced
  • Irrigation management project...
  • Cite this
  • Text this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Cover Image
QR Code

Irrigation management project mid term evaluation report, Kathmandu, April 1989

Bibliographic Details
Main Authors: Ait Kadi, M., Easter, K.W., Franca, Z.P., Lohani, J.P., Peabody, N.S., Shrestha, M.M., Stanbury, P.
Format: Libro
Language:Inglés
Published: ISPAN 1989
Subjects:
project appraisal
evaluation
irrigation management
systems analysis
Online Access:https://hdl.handle.net/10568/36685
  • Description
  • Similar Items
  • Staff View
Description
Description not available.

Similar Items

  • Strengthening local analytical capability: Community options analysis and investment
    by: Bonis-Charancle, J.M., et al.
    Published: (2009)
  • Etude preparatoire de l'evaluation a Mi-Parcours du Projet IIMI-PMI-Niger: Rapport final - Etude realisee a la demande du Projet IIMI-PMI-Niger sous contrat en date du 18-10-1994. In FrenchPreparatory study of the Mid-Term Project IIMI-PMI-Niger: final report - study conducted at the request of the Project IIMI-PMI-Niger contract dated 18-10-1994. In French
    by: Abdourahmane, A.T.
    Published: (1995)
  • Model-based estimation of land subsidence in Kathmandu Valley, Nepal
    by: Shrestha, P.K., et al.
    Published: (2017)
  • Integrating participatory mapping and GIS to build local information systems
    by: Robiglio, Valentina, et al.
    Published: (2009)
  • Scoring the importance of tropical forest landscapes with local people: patterns and insights
    by: Sheil, Douglas, et al.
    Published: (2006)

© Copyright 2026, Todos los Derechos Reservados UNA