Determination of optimal reservoir operation rule curves for the Finchaa hydropower project
| Autor principal: | |
|---|---|
| Formato: | Tesis |
| Lenguaje: | Inglés |
| Publicado: |
Addis Ababa University
2007
|
| Acceso en línea: | https://hdl.handle.net/10568/21505 |
Ejemplares similares: Determination of optimal reservoir operation rule curves for the Finchaa hydropower project
- Studies on the tsetse flies of the Finchaa river valley.
- Combined simulation and optimization for reservoir system sizing and operation
- Analyzing the impact of alternative operational rules on water distribution
- Analyzing the impact of alternative operational rules on water distribution
- Analyzing the impact of alternative operational rules on water distribution
- The economics of re-operating the Akosombo and Kpong hydropower dams