Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Group Problem Management Plus (g-PM+) Pilot, Follow-up 1
IFPRI, in collaboration with World Vision (WV) and implementation partners, evaluated the impact of a psychotherapy intervention, group Problem Management plus (gPM+), with and without a one-time lump sum cash transfer. The study is an interventional study using a cluster randomized control trial (c...
| Autor principal: | |
|---|---|
| Formato: | Conjunto de datos |
| Lenguaje: | Inglés |
| Publicado: |
International Food Policy Research Institute
2024
|
| Materias: | |
| Acceso en línea: | https://hdl.handle.net/10568/168511 |
Ejemplares similares: Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Group Problem Management Plus (g-PM+) Pilot, Follow-up 1
- Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Group Problem Management Plus (g-PM+) Pilot, Follow-up 2
- Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Group Problem Management Plus (g-PM+) Pilot Baseline Survey
- Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Group Problem Management Plus (g-PM+) Pilot Screening Survey
- Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Group Problem Management Plus (g-PM+) Pilot Screening Survey
- SPIR II Group Problem Management Plus (gPM+) Baseline Survey in Tigray, Ethiopia
- Strengthen PSNP Institutions and Resilience Phase II (SPIR II), Ethiopia: Baseline Survey