Digital repeat photography to operationalize fail-safe contract design in index insurance in Ethiopia
A study implemented in 2019 confirmed the feasibility of the prototype and a follow-up pilot in 2020 provided insights on how to take this approach to a larger scale within the R4 initiative.
| Main Author: | |
|---|---|
| Format: | Informe técnico |
| Language: | Inglés |
| Published: |
2020
|
| Subjects: | |
| Online Access: | https://hdl.handle.net/10568/122095 |
| Summary: | A study implemented in 2019 confirmed the feasibility of the prototype and a follow-up pilot in 2020 provided insights on how to take this approach to a larger scale within the R4 initiative. |
|---|