Skip to content
VuFind
    • English
    • Español
Advanced
  • Adjusting hydropower dam opera...
  • Cite this
  • Text this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Cover Image
QR Code

Adjusting hydropower dam operation to compliment livelihood strategies in the Lower Mekong Basin

Bibliographic Details
Main Authors: Reis, J., Lacombe, Guillaume, Hoanh, Chu Thai, McCartney, Matthew P., Douangsavanh, Somphasith, Leticia, M., Teoh, S.J., Kam, Suan Pheng, Senaratna Sellamuttu, Sonali
Format: Conference Paper
Language:Inglés
Published: CGIAR Challenge Program on Water and Food 2011
Online Access:https://hdl.handle.net/10568/10450
  • Description
  • Similar Items
  • Staff View
Description
Description not available.

Similar Items

  • Diversification of livelihood opportunities of communities impacted by hydropower dam: A case study of THB reservoir, Lao PDR
    by: Pant, J., et al.
    Published: (2011)
  • Better preparation for the changes of livelihoods of ethnic minorities: Case study of the Lower Sesan 2 hydropower dam in Cambodia
    by: Samonn, Mith, et al.
    Published: (2011)
  • Integrating interventions for shoreline farming and fishing into dam operation [Abstract only].
    by: Reis, J., et al.
    Published: (2013)
  • A decision-support-system (DSS) framework for linking livelihoods with reservoir operation: Experiences from MK1 case studies in the Mekong Basin
    by: Hoanh, Chu Thai, et al.
    Published: (2011)
  • The effects of hydropower dams on the hydrology of the Mekong basin
    by: Hecht, Jory, et al.
    Published: (2014)

© Copyright 2026, Todos los Derechos Reservados UNA