Adjusting hydropower dam operation to compliment livelihood strategies in the Lower Mekong Basin
| Main Authors: | , , , , , , , , |
|---|---|
| Format: | Conference Paper |
| Language: | Inglés |
| Published: |
CGIAR Challenge Program on Water and Food
2011
|
| Online Access: | https://hdl.handle.net/10568/10450 |
Similar Items: Adjusting hydropower dam operation to compliment livelihood strategies in the Lower Mekong Basin
- Diversification of livelihood opportunities of communities impacted by hydropower dam: A case study of THB reservoir, Lao PDR
- Better preparation for the changes of livelihoods of ethnic minorities: Case study of the Lower Sesan 2 hydropower dam in Cambodia
- Integrating interventions for shoreline farming and fishing into dam operation [Abstract only].
- A decision-support-system (DSS) framework for linking livelihoods with reservoir operation: Experiences from MK1 case studies in the Mekong Basin
- The effects of hydropower dams on the hydrology of the Mekong basin
- The effects of hydropower dams on the hydrology of the Mekong Basin