Implementing IWRM national initiatives in Ghana: Challenges at the local level within the Volta Basin
| Autores principales: | , , , |
|---|---|
| Formato: | Conference Paper |
| Lenguaje: | Inglés |
| Publicado: |
CGIAR Challenge Program on Water and Food
2011
|
| Acceso en línea: | https://hdl.handle.net/10568/10395 |
Ejemplares similares: Implementing IWRM national initiatives in Ghana: Challenges at the local level within the Volta Basin
- Local challenges for IWRM in Afghanistan
- Integrated water resource management (IWRM) research for mitigating drought and improving livelihoods within the Limpopo Basin
- IWRM in Uganda-progress after decades of implementation
- Volta Basin Development Challenge Documentary Video
- Can institutions be designed? : analysing the challenges to implementation of IWRM in Kyrgyzstan from post-institutional perspective
- Calculation of environmental flows within the major tributaries of the Volta Basin, West Africa