Ejemplares similares: Integrating malaria controls into multi-purpose reservoir management: Koka Dam reservoir, Ethiopia
- Effect of a large dam on malaria risk: The Koka reservoir in Ethiopia
- Effect of a large dam on malaria risk: The Koka Reservoir in Ethiopia
- Manipulating dam operation for malaria control: an investigation of the Koka dam, Ethiopia
- Malaria cases in relation to proximity to the Koka Reservoir
- How does an Ethiopian dam increase malaria?: entomological determinants around the Koka Reservoir
- Malaria transmission in the vicinity of impounded water: evidence from the Koka Reservoir, Ethiopia
Autor: Reis, J.
- Water resources implications of integrating malaria control into the operation of an Ethiopian dam
- Review of water resource and reservoir planning models for use in the Mekong Basin to improve livelihoods of local people impacted by reservoir development
- Manipulating dam operation for malaria control: an investigation of the Koka dam, Ethiopia
- Adjusting hydropower dam operation to compliment livelihood strategies in the Lower Mekong Basin
- A decision-support-system (DSS) framework for linking livelihoods with reservoir operation: Experiences from MK1 case studies in the Mekong Basin
- Reservoir operation for recession agriculture in Mekong basin, Laos