Ejemplares similares: Soil fertility effect on water productivity of maize and potato in Abay Basin
- Characteristics and on-site financial costs of erosion in the Meja watershed of the Abay basin, Ethiopia
- Characteristics and onsite financial cost of erosion in Abay Basin: The case study from Meja Watershed
- Enhancing farming system water productivity through alternative land use and water management in vertisol areas of Ethiopian BlueNile Basin (Abay)
- Blue Nile (Abay) hydropower potential, prioritization and tradeoffs on priority investments
- Blue Nile (Abay) hydropower potential, prioritization, and trade-offs on priority investments
- Characterization and productivity assessment of the farming systems in the upper part of the Nile Basin
Autor: Erkossa, Teklu
- Agricultural water productivity across landscape positions and management alternatives
- Characteristics and onsite financial cost of erosion in Abay Basin: The case study from Meja Watershed
- On-farm smallholder irrigation performance in Ethiopia: From water use efficiency to equity and sustainability
- Development and testing of low-cost animal drawn minimum tillage implements: Experience on Vertisols in Ethiopia
- Technical and economic performance of animal-drawn implements for minimum tillage: Experience on Vertisols in Ethiopia
- Site-specific fertilizer recommendation using data driven machine approaches enhanced wheat productivity and resource use efficiency
Autor: Awulachew, Seleshi Bekele
- Analysis of water use on a large river basin using MIKE BASIN Model: a case study of the Abbay River Basin, Ethiopia
- Application of the Water Evaluation and Planning (WEAP) Model to simulate current and future water demand in the Blue Nile
- Assessment of potential environmental impacts of two large scale irrigation schemes in Ethiopia
- Development of rainfall-runoff-sediment discharge relationship in the Blue Nile Basin
- Blue Nile flow, sediment and impact of watershed interventions: case of Gumera Watershed
- Rainfall-runoff modelling of Laelay Wukro Watershed using HEC-GeoHMS and HEC-HMS under limited data condition